Friday, 16 August 2013
Rowley Regis School
ESH were contracted to provide frost protection to a section of cold water pipework in an external minimum ambient temperature of -20°C. Type ESRS self regulating heating tape was supplied and installed to complete the job.
Thursday, 15 August 2013
Connagh's Quay WWTW
ESH supplied and installed a 240 volt trace heating system to provide frost protection to two sets of identical stainless steel pipework (60mm dia) containing water.
Thursday, 1 August 2013
Bishop Of Winchester Academy, Bournemouth
The academy is undergoing a £14.5 million rebuild with a completion date of February 2014. Within this modern academy ESH provided frost protection to the heat recovery and cold water pipework in an external minimum ambient temperature of -20°C. This project required a large amount of constant wattage heating tape to complete.
Development Training, Linilthgow
Within this training centre for this national training giant, ESH designed, supplied and installed a frost protection trace heating system to the external Methene pipework.
Ewer Street Student Accommodation, London
Phoenix Academy, Telford
The University of Sheffield (Royal Exchange Building)
Subscribe to:
Comments (Atom)

