Friday, 16 August 2013

Rowley Regis School

ESH were contracted to provide frost protection to a section of cold water pipework in an external minimum ambient temperature of -20°C. Type ESRS self regulating heating tape was supplied and installed to complete the job.

Thursday, 15 August 2013

Connagh's Quay WWTW

ESH supplied and installed a 240 volt trace heating system to provide frost protection to two sets of identical stainless steel pipework (60mm dia) containing water. 

Thursday, 1 August 2013

Bishop Of Winchester Academy, Bournemouth

The academy is undergoing a £14.5 million rebuild with a completion date of February 2014. Within this modern academy ESH provided frost protection to the heat recovery and cold water pipework in an external minimum ambient temperature of -20°C. This project required a large amount of constant wattage heating tape to complete.

Development Training, Linilthgow

Within this training centre for this national training giant, ESH designed, supplied and installed a frost protection trace heating system to the external Methene pipework.

Ewer Street Student Accommodation, London


This was our second project down at Ewer Street after previously installing an internal hot water temperature maintenance system. 

On this occasion ESH were contracted to supply and install a frost protection trace heating system to protect the roof mounted cold water pipework.



Phoenix Academy, Telford

For this local Academy, ESH designed, supplied and installed a trace heating system to provide frost protection to the roof mounted pipework. The metal pipework included the heating pipes associated with three air handling units and also five other pipes of various services. Over 530 metres of constant wattage heating tape was installed in total.

The University of Sheffield (Royal Exchange Building)


Part of the refurbishment of this graduate research office, ESH were contracted to design, supply and install a trace heating system onto the external CHW metal pipework to provide frost protection.