Thursday, 31 January 2013
Severn Trent, Stourbridge
Supplied and installed both the trace heating and thermal insulation to provide frost protection to the indoor pipework within a laboratory. The system was designed utilising our type VC constant wattage heating cable.
Monday, 28 January 2013
S & A Foods, Derby
Within this large food manufacturing plant we supplied and installed a frost protection system to plastic pipework between a portacabin and the adjacent main building.
Westminster City Council
Supplied and installed a trace heating system to temperature maintain the domestic hot water pipework at +65°C within this Greater London council building.
Wednesday, 23 January 2013
Coca Cola, Uxbridge
Tuesday, 22 January 2013
Audi Dealership, Leeds
Within the brand new Audi showroom, ESH designed, supplied and installed a frost protection trace heating system to the CHW pipework.
Birmingham Heartlands Hospital
Monday, 14 January 2013
Balfour Beatty Modules
ESH were asked to design, supply and install multiple hot water temperature maintenance systems onto 'OFF SITE' modular buildings. Over 300 metres of type H2OWAT self regulating heating cable was installed.
BIAD Project, Millennium Point, Birmingham
Birmingham Institute of Arts and Design (BIAD) is the brand new, state of the art facility in the heart of Birmingham. For the large project, ESH were contracted to design, supply and install a frost protection system to external pipework. In total over 900 metres of type VCB constant wattage heating cable was installed.Tuesday, 8 January 2013
Princess Foods, Bradford
As part of Princes £40m redevelopment and expansion at their Bradford soft drinks factory, ESH supplied and installed a dual Trace Heating system to maintain the pipework at a temperature of 60°C. There were a total of five pipes, each 46 metres in length, installed with a primary and secondary system.
Monday, 7 January 2013
E2 Office Building, IQ Winnersh Business Park