Monday, 14 January 2013

BIAD Project, Millennium Point, Birmingham

Birmingham Institute of Arts and Design (BIAD) is the brand new, state of the art facility in the heart of Birmingham. For the large project, ESH were contracted to design, supply and install a frost protection system to external pipework. In total over 900 metres of type VCB constant wattage heating cable was installed.


No comments:

Post a Comment