2013 Project List

Welcome to ESH Trace Heating Ltd's project list for 2013.

Thursday, 7 February 2013

Pinderfields Hospital, Wakefield


Designed, supplied and installed a trace heating system to temperature maintain the domestic hot water pipework at +55°C with a purge facility up to +65°C.
* When Is Hot Water Temperature Maintenance Required? *
Posted by ESH Trace Heating Ltd at 02:48
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Health Care, Hot Water Temperature Maintenance, Self Regulating, Wakefield
Location: Wakefield, West Yorkshire WF1 4DG, UK

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2013 (114)
    • ►  December (7)
    • ►  November (7)
    • ►  October (6)
    • ►  September (10)
    • ►  August (7)
    • ►  July (17)
    • ►  June (10)
    • ►  May (8)
    • ►  April (7)
    • ►  March (13)
    • ▼  February (12)
      • Portland Street Development, Birmingham
      • Lincoln College, University of Oxford
      • Wilton Centre, Redcar
      • Hull WWTW
      • Horiba Instruments, Northampton
      • Aston University, Birmingham
      • Leadenhall Building, London
      • Ewer Street Student Accommodation, London
      • Pinderfields Hospital, Wakefield
      • North Birmingham Academy
      • Primark Store, Chester
      • Pitcher & Piano, Chester
    • ►  January (10)

Contributors

  • ESH Trace Heating Ltd
  • Unknown
Simple theme. Theme images by mariusFM77. Powered by Blogger.