Tuesday, 7 May 2013

Furness Academy, Barrow-In-Furness


For this brand new Academy on the edge of the Lake District, ESH designed, supplied and installed a trace heating system to perform the duty of frost protecting external chilled water pipework. Over 400 metres of ESH constant wattage heating cable was installed in total.

No comments:

Post a Comment