Friday, 18 October 2013

Alison Business Centre, Sheffield

Supplied and installed a trace heating system for temperature maintenance of the HWS pipework at +55°C. Aluminium foil was also install to the plastic pipework prior to fitting the trace heating and the system was controlled using a HWAT-ECO controller.

No comments:

Post a Comment