For this trace heating and thermal insulation contract, ESH supplied and installed a frost protection system to the external plastic water supply pipework.
Thursday, 28 March 2013
Tuesday, 26 March 2013
Molson Coors Brewery, Burton On Trent
Monday, 25 March 2013
St James Hospital, Leeds
On this Raychem specified trace heating project, ESH installed a frost protection system to external pipework using Raychem self regulating heating tape.
NAPP Pharmaceuticals, Cambridge
For this large project, ESH were asked to design, supply and install a frost protection trace heating system to internal sprinkler pipework.
Thursday, 21 March 2013
Good Hope Hospital, Sutton Coldfield
This was our second project within Good Hope after work on the endoscopy and ultrasound roofs back in 2004. This time ESH were contracted to design, supply and install a trace heating system to freeze protect the condense pipework again on the hospital roof.
Wednesday, 20 March 2013
Nottingham Incinerator Plant
Here we were contracted to inspect the heating cable already installed on the hoppers, by testing the circuit for insulation resistance, testing the resistance to determine the heating load and checking the operation of the thermostat.
Thursday, 14 March 2013
7-11 Bishopsgate Offices, London
Within this large (6,000sqm) office building, ESH were contracted to design, supply and install two separate trace heating systems:
Wednesday, 13 March 2013
SAFC Hitech, Wirral
For this process temperature maintenance project, ESH were asked to design, supply and install a trace heating system to maintain +80°C. Type VC constant wattage heating cable was double traced underneath the pipework in order to achieve the required temperature.
Swinford WTW, Oxford
Within this water treatment works ESH supplied and installed a trace heating system for the frost protection of the external plastic pipework.
Labels:
Frost Protection,
Oxford,
Water Treatment
Location:
Oxford, UK
Monday, 11 March 2013
Denco Lubrication, Hereford
For this project we supplied and installed a trace heating and thermal insulation system of oil pipework and fittings on two large skids. The purpose of the system was to temperature maintain the pipework at +10°C.
European Centre for Medium Weather Forecasts, Reading
Tuesday, 5 March 2013
Wickham STW
Supplied and installed a trace heating system to frost protect humus de-sludge, humus feed pump station, septic tank area and inlet area pipework.
Monday, 4 March 2013
Sheffield University, Science Administration Building
For this large project, ESH were contracted to design, supply and install two trace heating systems:


- System one was for the frost protection of the chilled water feed and chilled works system pipework (type VC constant wattage heating cable installed).
- The second system required the temperature maintenance of the internal heating pipework (type H2OWAT55 self regulating cable installed).