Thursday, 14 March 2013

7-11 Bishopsgate Offices, London

Within this large (6,000sqm) office building, ESH were contracted to design, supply and install two separate trace heating systems:

  • System one was for the frost protection for the roof mounted BCWS pipework
  • System two for the temperature maintenance of +55°C on the washroom pipework from the basement area up to the 6th floor


No comments:

Post a Comment