Sheffield University, Science Administration Building

For this large project, ESH were contracted to design, supply and install two trace heating systems:

  • System one was for the frost protection of the chilled water feed and chilled works system pipework (type VC constant wattage heating cable installed). 
  • The second system required the temperature maintenance of the internal heating pipework (type H2OWAT55 self regulating cable installed).
  