Monday, 16 September 2013

B Mason Ltd, Birmingham

This project involved ESH providing frost protection to cold water pipework in an external minimum ambient temperature of -20°C. The system was arranged into three circuits which were interconnected with the thermostat and existing control panel.

No comments:

Post a Comment