The cathedral is one of the most famous and most recognisable sights in London and ESH were proud to be part of the Churchyard redevelopment.
On site ESH designed, supplied and installed a trace heating system to provide frost protection to the chilled water, heating and CWS pipework in the basement area.
In excess of 550 metres of trace heating cable was install in total.
On site ESH designed, supplied and installed a trace heating system to provide frost protection to the chilled water, heating and CWS pipework in the basement area.
In excess of 550 metres of trace heating cable was install in total.
* Frost Protection *

No comments:
Post a Comment