Thursday, 28 November 2013

Gloucester Quays Shopping Centre

After a successful project at the Quays Cineworld, ESH were back down to Gloucester to supply and install the following trace heating systems:

  • A 240 volt trace heating system for the frost protection of cold water plastic and steel pipework
  • A temperature maintenance system to the HWS pipework at +55°C in two wash room areas

No comments:

Post a Comment