Wednesday, 27 November 2013

Zenith House, Barnet

This large scale housing development will provide 308 new flats and 20 mews houses to the Barnet area of London. 

For this trace heating project, ESH were contracted to design, supply and install a frost protection system to the following pipework:

  • 780m of BCWS pipe
  • 330m of category 5 pipework  
  • 145m of cold water pipe (sizes ranged from 1" to 4" diameter)

No comments:

Post a Comment